With origins in the eighteenth century the hotel was originally built as a stopover for passengers travelling by stage coach along the old A9 to Inverness and the North of Scotland.
Location Cairngorm National Park, Kingussie
Electricity Use: 45 kWe for hotel and grid export
Heating Use: Hotel heating, hot water and wood drying
System: 1 x Spanner Wood Power System HK 45
Performance: 47 kWe, 90 kWth CHP and 15 kWth Gasifier
Wood Chip Source: Local sawmills